Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations

Certain statements in this Quarterly Report on Form 10-Q, or the Report, are "forward-looking statements." These forward-looking statements include, but are not limited to, statements about the plans, objectives, expectations and intentions of Searchlight Minerals Corp., a Nevada corporation (referred to in this Report as "we," "us," "our" or "registrant") and other statements contained in this Report that are not historical facts. Forward-looking statements in this Report or hereafter included in other publicly available documents filed with the Securities and Exchange Commission, or the Commission, reports to our stockholders and other publicly available statements issued or released by us involve known and unknown risks, uncertainties and other factors which could cause our actual results, performance (financial or operating) or achievements to differ from the future results, performance (financial or operating) or achievements expressed or implied by such forward-looking statements. Such future results are based upon management's best estimates based upon current conditions and the most recent results of operations. When used in this Report, the words "expect," "anticipate," "intend," "plan," "believe," "seek," "estimate" and similar expressions are generally intended to identify forward-looking statements, because these forward-looking statements involve risks and uncertainties. There are important factors that could cause actual results to differ materially from those expressed or implied by these forward-looking statements, including our plans, objectives, expectations and intentions and other factors that are discussed under the section entitled "Risk Factors," in this Report and in our Annual Report on Form 10-K for the year ended December 31, 2008.

The following discussion and analysis summarizes our plan of operation for the next twelve months, our results of operations for the three and six month periods ended June 30, 2009 and changes in our financial condition from our year ended December 31, 2008. The following discussion should be read in conjunction with the Management's Discussion and Analysis or Plan of Operation included in our Annual Report on Form 10-K for the year ended December 31, 2008.

Executive Overview

We are an exploration stage company engaged in the acquisition and exploration of mineral properties and slag reprocessing projects. Our business is presently focused on our two mineral projects: (i) the Clarkdale Slag Project, located in Clarkdale, Arizona, which is a reclamation project to recover precious and base metals from the reprocessing of slag produced from the smelting of copper ore mined at the United Verde Copper Mine in Jerome, Arizona; and (ii) the Searchlight Gold Project, which involves exploration for precious metals on mining claims near Searchlight, Nevada.

Clarkdale Slag Project. Since our acquisition of 100% of the Clarkdale Slag Project in 2007, we have devoted considerable effort designing and engineering our first production module, which included finalizing the production flow sheet, sourcing and purchasing equipment as well as refurbishing the module building and constructing the electrowinning building. The module and electrowinning buildings house the first production module, which has been designed to allow for the grinding, leaching, filtering and extraction of precious and base metals from the slag material and is expected to process between 100 and 250 tons of slag material per day. During 2008, we completed the refurbishing and construction of the module and electrowinning buildings, respectively, and we installed all the necessary equipment in the two buildings for the operation of the first production module. Also in 2008, we expended approximately $1,000,000 to immediately address Phase II long lead-time items such as grading 12 acres of land, drilling a well and preparing the architecture and engineering drawings for the proposed full-scale production facility. In the first two quarters of 2009, we have been executing our business plan on the Clarkdale Slag Project, which includes the start-up and operation of the first production module, in an effort to achieve consistent levels of gold and silver extraction that would support the economic feasibility of a commercial production facility.


[[Image Removed]]

On June 17, 2008, we received a Certificate of Occupancy for the laboratory facilities located within the module building, allowing our chemists to conduct immediate, on-site analyses of leaching results to further optimize the metals extraction process. On August 8, 2008, we received a Certificate of Occupancy for the module building, allowing us to operate the grinding, leaching, filtering and resin extraction equipment within the module building. On December 30, 2008, we received a Certificate of Occupancy for the electrowinning building, allowing us to operate the copper and zinc electrowinning equipment within the electrowinning building.

We have completed the construction of the production module for the Clarkdale Slag Project and are now actively engaged in the testing and start-up phase of the project. Since the start of 2009, the primary emphasis has been placed on the crushing and grinding circuits as well as the leaching and extraction of precious metals (gold and silver). To date, our internal laboratory testing has reflected consistent levels of extractable precious metals in pregnant leach solutions from the Clarkdale slag material. We believe that we can improve extraction rates further by optimizing the grind, the chemical characteristics of the leach solutions and the amount of residence time required for maximum grind and leach efficiency. We have engaged Mountain States R&D International, Inc., an independent engineering firm, to analyze, in accordance with chain-of-custody standards, the internal operating results of the gold circuit, which we believe comprises the majority of the potential value of the entire Clarkdale Slag Project.


We incurred delays during the construction of our production module, including delays in receiving large pieces of equipment from manufacturers, engineering related delays due to the complexity of installing the production module equipment in a World War I era module building and the decision to construct a separate building to house the electrowinning equipment after it was determined that the electrowinning equipment would not adequately fit in the module building. Consequently, the construction timeline for completing the production module was extended by approximately twelve months from what we originally anticipated and there was an approximately 55% increase in costs from what we had originally projected.

We anticipate that the operation of our production module will allow us to determine the economics of the project and serve as the basis for the final feasibility of the project. If the feasibility of the project establishes economic viability, we expect to commence construction of a full-scale production facility where we intend to install subsequent modules in parallel where we expect that each subsequent module would be comparable in technology and scale to the initial production module. The number of subsequent modules required to attain full-production of 2,000 tons per day will be determined once the initial production module capacity is determined. The cost of developing our initial production module was approximately $12,000,000. We do not believe that the construction of subsequent modules will cost as much because: (i) of the knowledge we have developed in the construction of the initial production module, and (ii) any additional modules will be new construction, rather than rehabilitation of an older building. However, the scope and size of our full-scale production facility, including the number of additional modules, the timing and cost of additional modules and the economies of scale of a production facility, will depend upon a number of factors, including the results of a feasibility study and the availability of funding. A more thorough economic analysis of the full-scale production facility, including specific capital and operating costs, funding schedules and funding sources, is expected to occur during the feasibility evaluation of the initial production module. The first stage of the feasibility evaluation began in the second quarter of 2009 when we engaged Mountain States to analyze, in accordance with chain-of-custody standards, the internal operating results of the gold circuit of the Clarkdale Slag Project.

We have budgeted $2,400,000 for our work program on the Clarkdale Slag Project over the next twelve months, which includes the operation of the production module and performing the feasibility study. A decision on allocating approximately $6,000,000 of additional funds for the Phase II expansion and $4,700,000 to complete the development of an Industrial Collector Road pursuant to an agreement with the Town of Clarkdale, Arizona by January 2011 will be made once the first production module is operational and its results are analyzed.

We expect that there will be significant financing requirements in order to finance the construction of a full-scale production facility, and cannot assure you that such funding will be available at all or on terms that are reasonably acceptable to us. If the results from our feasibility study and the results from the operation of the production module do not support a basis for us to proceed with the construction of our proposed, full-scale production facility or we cannot obtain funding at all or on terms that are reasonably acceptable to us, we will have to scale back or abandon our proposed operations on the Clarkdale Slag Project. If management determines, based on any factors, including the foregoing, that capitalized costs associated with any of our mineral interests are not likely to be recovered, we would incur a significant impairment of our investment in such property interests on our financial statements.

In January 2009, we submitted a development agreement to the Town of Clarkdale for development of an Industrial Collector Road. The purpose of the road is to provide us with the capability to enhance the flow of industrial traffic to and from the Clarkdale Slag Project. The construction of the road is required infrastructure improvement under the terms of our conditional use permit with the Town of Clarkdale. The Town of Clarkdale approved the development agreement on January 9, 2009.

The development agreement provides that its effective date will be the later of
(i) 30 days from the approving resolution of the agreement by the Clarkdale Town Council; or (ii) the date on which the Town of Clarkdale obtains a connection dedication from separate property owners who have land that will be utilized in construction of the road; or (iii) the date on which the Town of Clarkdale receives the proper effluent permit. The Town of Clarkdale has approved the development agreement, and the remaining two contingencies with respect to the effectiveness of the development agreement are beyond our control.


Under the development agreement, we are obligated to complete the development of the road within two years after the effective date of the agreement. If we do not complete the road within the two year period, we may lose our conditional use permit from the Town of Clarkdale. Further, as a condition of our developing any of our property that is adjacent to the Clarkdale Slag Project, we will be required to construct additional enhancements to the road. We will have ten years from the start of construction on the road in which to complete the additional enhancements. However, we do not currently have any defined plans for the development of the adjacent property.

We estimate that the initial cost of construction of the road will be approximately $3,500,000 and that the cost of the additional enhancements will be approximately $1,200,000. We will be required to fund the costs of this construction. Based on the uncertainty of the timing of these contingencies, we have not included these costs in our current operating plans or budgets. However, we will require additional project financing or other financing in order to fund the construction of the road and the additional enhancements. There are no assurances that we will be able to obtain additional financing in an amount sufficient to meet our needs or on terms that are acceptable to us. The failure to complete the road and the additional enhancements in a timely manner under the development agreement would have a material adverse effect on the Clarkdale Slag Project and our operations.

Searchlight Gold Project. Since 2005, we have maintained an ongoing exploration program on our Searchlight Gold Project and have contracted with Arrakis, Inc. ("Arrakis"), an unaffiliated mining and environmental firm, to perform a number of metallurgical tests on surface and bulk samples taken from the project site under strict chain-of-custody protocols. In 2007, results from these tests validated the presence of gold on the project site, and identified reliable and consistent metallurgical protocols for the analysis and extraction of gold, such as microwave digestion and autoclave leaching. Autoclave methods typically carry high capital and operating costs on large scale projects, however, we were encouraged by these results and in the first quarter of 2008, and we approved a continuation of the metallurgical work program with Arrakis. The goal of this work program is to attempt to further improve upon the extraction grades of gold from samples taken from the project and explore in more detail the potential capital and operating costs of implementing methods, such as autoclave leaching.

During the second quarter of 2008, we "double staked" the Searchlight property by filing, with the United States Bureau of Land Management ("BLM") and the Clark County, Nevada Recorder, 142 new and separate 20-acre placer claims overtop of the twenty existing 160-acre claims. We were only able to "double stake" 2,840 acres out of the 3,200 acre site due to various regulatory restrictions on staking of certain of the smaller land parcels on the site. We have maintained the twenty prior 160-acre claims to provide us with a basis to retain the priority of and defend our existing 160-acre mining claims.

The former Searchlight Claim owners had previously obtained a BLM approved Plan of Operations, which included permission to drill eighteen holes on the 3,200 acre project area and to mine a 36-acre pit on our RR304 claim. We had anticipated conducting our early stage exploratory work on the Searchlight Claims property by utilizing the Plan of Operations issued to the former Searchlight Claim owners, until such time as we would obtain a permit for exploration and development in our own name or the former Searchlight Claim holder's permit was transferred to us. Although we did not acquire the Searchlight Claims with a written agreement to purchase the Plan of Operations, the prior owners verbally agreed to cooperate with us in attempting to transfer their Plan of Operations into our name.

Although the Plan of Operations was accepted and registered in the name of a former Searchlight Claim owner, which is an affiliate of K. Ian Matheson, one of our principal stockholders and a former officer and director, in September 2007, we learned that the BLM had issued an order (the "BLM Order") for "Immediate Suspension of All Activities" notice on May 12, 2006 against Mr. Matheson and certain of his affiliates (Pass Minerals, Inc., Kiminco, Inc. and Pilot Plant Inc., which also were prior Searchlight Claim owners and are our stockholders) with respect to a dispute with the BLM on a project unrelated to the Searchlight Gold Project. The dispute between the BLM and Mr. Matheson arose due to the BLM's determination that Mr. Matheson and his affiliates had engaged in willful mineral trespass for the unauthorized removal of sand and gravel from public lands by Mr. Matheson and his affiliates or their predecessors. The BLM had demanded payment of approximately $2,530,000 for the willful trespass. After failure by Mr. Matheson and his affiliates to pay the amount, the BLM issued the BLM Order. The issuance of the BLM Order restricted our ability to rely upon the Plan of Operations to conduct our early stage exploratory work on the Searchlight Claims property until such time that we may obtain our own Plan of Operations. An appeal by Mr. Matheson of the BLM Order with the Interior Board of Land Appeals affirmed the BLM's decision, keeping the BLM Order in effect. The BLM Order effectively covered all projects tied to Mr. Matheson.


As a result of the BLM Order, we have been delayed in our ability to drill on the Searchlight Gold Project property. However, we have anticipated that regulatory and other delays would take place, which are typical in our industry. We have applied for a new Plan of Operations in our name and are currently in the course of the BLM's review process. In addition, we have continued and will continue with our surface sampling and metallurgical testing program while awaiting approval of a new Plan of Operations.

In the third quarter of 2008, we submitted a Plan of Operations to the BLM in our name, substantially similar to the original Plan of Operations, which included a request to drill eighteen holes on the project area and to mine a 36-acre mining pit. On August 27, 2008, the BLM responded, in part, by advising that the previous bond that we posted of $180,500 for the previous Plan of Operations would not be transferrable to the new one and that a new bond would have to be posted. At the time, we considered the recovery of the reclamation bond to be uncertain and, therefore, we have established a full allowance against the reclamation bond with the offsetting expense to project exploration costs. Based on continued discussions with the BLM, we may be able to recover the bond upon request, however, we have not chosen to make such a request at this time.

In September 2008, we decided that we would only continue to pursue the permits to drill on the project area and forgo the 36-acre pit until a later date since we believed that by keeping the pit area in the Plan of Operations, it might delay the BLM's approval process for our Plan of Operations. Although the 36-acre pit had been part of the Plan of Operations obtained by the prior owners of the Searchlight Claims, we do not believe that digging and mining a 36-acre pit would be a material aspect of the Plan of Operations at this stage of the Searchlight Gold Project. Therefore, we decided to remove the 36-acre pit from the Plan of Operations. Further, by reducing the scope of the permit, we decided that we could submit the application in the form of a Notice of Intent, a shorter and less complex application form than a Plan of Operations. Consequently, on September 24, 2008, we withdrew the Plan of Operations and submitted a Notice of Intent with the BLM, pursuant to which we sought permission to drill eighteen 500-foot drill holes on the Searchlight project area.

After a series of correspondence between us and the BLM, on December 15, 2008, we received a letter from the BLM advising us that the BLM had closed our Notice of Intent from consideration and that a new Plan of Operations would be required based on two issues relating to the Desert Tortoise (Gopherus asassizii), a Federally listed Threatened Species: (i) the proximity of the project area to a nearby Area of Critical Environmental Concern (ACEC); and (ii) the future likelihood of tortoises being present on the land within the project area which is involved in the application.

On January 13, 2009, we filed a Notice of Appeal of the BLM's decision regarding the closing of our Notice of Intent, and, thereafter, submitted a statement of reasons relating to the appeal, which supports our case that we should be allowed to obtain our desired drilling permits through a Notice of Intent, as opposed to a Plan of Operations, even considering the Searchlight Project's proximity to the ACEC.

Although we are still following through with our appeal regarding the closing of our Notice of Intent, we determined that, due to the standard lengthy time required to have a Plan of Operations approved by the BLM and should we be unsuccessful with our appeal, it would be prudent to begin the approval process immediately by filing for our Plan of Operations. Thus, on March 23, 2009, we submitted a new Plan of Operations to the BLM, taking into account the Desert Tortoise issue. In our Plan of Operations, we have requested permission to drill eighteen drill holes on the project area. In the event of the approval of our Plan of Operations, we will be required to post a new reclamation bond with the BLM, which we anticipate will be approximately $16,000. After a further series of correspondence between us and the BLM, on June 3, 2009, we received a comment letter from the BLM regarding our Plan of Operations, which included requests to clarify issues related to the location of fuels and lubricants being used by us, the location of potential new disturbances in connection with new road construction, a map edit and our materials storage area. We responded to the BLM's questions by letter on July 2, 2009.


There is no regulatory time frame for the BLM to review our Plan of Operations. We understand that the average time frame for approval of a plan of operation by the Las Vegas, Nevada branch office of the BLM since January 1, 2000 has been approximately four years and five months. Although we understand that the average time frame of the application process by the Las Vegas branch office of the BLM relating to an environmental assessment in connection with a plan of operations is approximately eleven months, the "threatened species" issue raised by the BLM requires the BLM to consult with the U.S. Fish and Wildlife Service of the Department of Interior, and the BLM has no control over the length of this consultation process in order to develop any necessary environmental mitigation measures.

Whether we obtain an approved Notice of Intent or Plan of Operations, our work on the project site will be limited to the scope within the Notice of Intent or Plan of Operations. However, the Plan of Operations approval process will delay the start of our drilling program for an undetermined period of time. To perform any additional drilling or mining on the project, we would be required to submit a new application to the BLM for approval prior to the commencement of any such additional activities.

We do not believe these added requirements will have a material adverse impact on our overall business plan for the Searchlight Gold Project, given that we have received no indication from the BLM, at this time, that the BLM will ultimately deny our request for approval of our Plan of Operations. However, there is no assurance of the timeline for approval by the BLM or that the BLM will grant approval. Our drilling and mining program on this project is dependent on obtaining the necessary approval from the BLM. Therefore, if approval ultimately is not obtained, we may have to scale back or abandon exploration efforts on the project. If management determines, based on any factors including the foregoing, that capitalized costs associated with any of our mineral interests are not likely to be recovered, we would incur a significant impairment of our investment in such property interests on our financial statements.

Further, although our ability to obtain drilling permits has been delayed, we have continued and intend to continue our current metallurgical program with Arrakis.

We have budgeted $200,000 to our twelve month work program for the Searchlight Gold Project. Our work program is focused on continuing the testing program with Arrakis, including metallurgical tests, bulk sampling, milling, leaching and extraction tests to optimize recovery of precious metals from samples taken from the project and exploring in more detail the potential capital and operating costs of implementing methods, such as autoclave leaching. We will also focus on our work with the BLM, our consultants and our attorneys to help us obtain approval of the Plan of Operations, containing the necessary permits to execute on our desired drilling program. The drilling and pre-feasibility program, which we anticipate will include an eighteen-hole drill program, chain-of-custody sampling and assaying of drill hole material, pilot plant tests and a pre-feasibility report, is expected to commence shortly after receiving the BLM's approval of the Plan of Operations.

Anticipated Cash Requirements

Our plan of operation calls for significant expenses in connection with the development of the Clarkdale Slag Project and the exploration of the Searchlight Gold Project. Over the next twelve months, our management anticipates that the minimum cash requirements for funding our proposed exploration and development program and our continued operations will be approximately $5,300,000. At July 31, 2009, we had cash reserves in the amount of approximately $2,300,000. This amount is substantially less than the total expenditures that we have budgeted for the next 12 months by approximately $3,000,000. We estimate that our current financial resources are sufficient to allow us to meet the anticipated costs of our exploration and development programs until approximately the middle of the fourth quarter of the 2009 fiscal year. However, if actual costs are greater than we have anticipated, we will require additional financing in order to fund our exploration and development plans for 2009. We do not currently have any financing arrangements in place, and there are no assurances that we will be able to obtain additional financing in an amount sufficient to meet our needs or on terms that are acceptable to us.


Our current twelve month plan also includes anticipated expenditure of approximately $6,000,000 on Phase II of our Clarkdale Slag Project and $4,700,000 to complete the development of an Industrial Collector Road pursuant to an agreement with the Town of Clarkdale, Arizona by January 2011, subject to funding availability. We will require additional funding to fulfill our entire anticipated plan of operations. In addition, the actual costs of completing those activities may be greater than anticipated.

Our estimated cash requirements for the next twelve months are as follows:

                                                               BUDGET

         Administrative Expenses                             $ 1,400,000
         Legal and Accounting Expenses                       $   800,000
         Consulting Services                                 $   500,000

         SUBTOTAL                                            $ 2,700,000

         Clarkdale Slag Project

         Production Module Operation                         $ 1,900,000
         Feasibility Study                                   $   500,000

         SUBTOTAL                                            $ 2,400,000

         Searchlight Gold Project
         Metallurgical Testing and Pre-Feasibility Program   $   100,000
         Permitting                                          $   100,000

         SUBTOTAL                                            $   200,000

         TOTAL                                               $ 5,300,000

Critical Accounting Policies

Use of estimates - The preparation of financial statements in conformity with accounting principles generally accepted in the United States requires management to make estimates and assumptions that affect the reported amounts of . . .

  Add SRCH.OB to Portfolio     Set Alert         Email to a Friend  
Get SEC Filings for Another Symbol: Symbol Lookup
Quotes & Info for SRCH.OB - All Recent SEC Filings
Sign Up for a Free Trial to the NEW EDGAR Online Pro
Detailed SEC, Financial, Ownership and Offering Data on over 12,000 U.S. Public Companies.
Actionable and easy-to-use with searching, alerting, downloading and more.
Request a Trial      Sign Up Now


Copyright © 2010 Yahoo! Inc. All rights reserved. Privacy Policy - Terms of Service
SEC Filing data and information provided by EDGAR Online, Inc. (1-800-416-6651). All information provided "as is" for informational purposes only, not intended for trading purposes or advice. Neither Yahoo! nor any of independent providers is liable for any informational errors, incompleteness, or delays, or for any actions taken in reliance on information contained herein. By accessing the Yahoo! site, you agree not to redistribute the information found therein.